"WE PRACTICE CUSTOMERS SERVICE ON SITE AND WE
HAVE ALWAYS GONE WHERE OUR CUSTOMERS ARE!"
 

SAERTEX® founder and Managing Director Bruno Lammers.

 


SAERTEX multiCom® - Headquarter, Saerbeck


Strong foundation from the Münsterland

In 2011 it was decided that at its headquarters in Saerbeck new production capacity and a new administration building should be built to accommodate the ever-growing international non-disruptive sewer renovation market.

The first phase began that summer with the new production hall for the impregnation of glass fibre liners. The highlight of this new hall is the ultra-modern resin mixing plant, which works unlike conventional systems, as a fully automated closed system, and as a complement to the very reliable infusion system, to offer unique quality assurance in the manufacture of GRP-liners.

Early in spring 2012, ground was broken for the generous administration building and the production hall for "dry goods", and the production of dry fibreglass liners up to DN 2200 is now possible with the new production facilities.

Due to the two production halls with a total of 14,000 square meters, and the new administration building with approximately 1,200 square feet, new possibilities and opportunities have emerged. But the Research and Development DEPARTMENT was to be handled by a new, spacious in house laboratory. In particular, the test stand for the testing of new products as well as the training and test site with different profiles and pipe diameters from DN 100 to 1200, complete the application-oriented development of GRP products with regard to the trenchless rehabilitation of pipes.

SAERTEX multiCom® GmbH
Brochterbecker Damm 52
48369 Saerbeck / Germany

Phone: +49 2574 902-400
Fax: +49 2574 902-409
E-Mail: multicom@saertex.com 
 

SAERTEX multiCom® Huntersville, USA


FLEXIBLE CUSTOMER SOLUTIONS FOR AMERICA

In early 2001 SAERTEX® took US production to an ultra-modern production plant in Huntersville near the US economic centre of Charlotte, North Carolina. Since then, the total production area has been expanded to over 11,000 square meters and now represents the largest production of multiaxial fabrics in America.

Therefore, the resulting fibres are used in the automotive and aerospace industries, in the wind industry, boat building and sports and leisure industry and, last but not the least, in the construction industry, such as in the production of liners for the trenchless renovation of sewer pipes.

SAERTEX multiCom® uses this infrastructure as a base for their business. In addition SAERTEX multiCom® opened a distribution centre in Denver, Colorado in 2009 and has invested in the latest UV curing technology. UV systems are available on-site for rent or purchase. In addition to a large UV curing system with a radial compressor capacity of up to 360 m³/hour and a UV dual core with 8 x 1000 Watts, a mobile UV system can also be installed in areas with limited space available.

SAERTEX multicom® LP
12200 Mt. Holly-Huntersville Rd.
Huntersville, NC 28078 / USA
 
Phone: +1 704 584-4059
Fax: +1 704 4694-5922
E-Mail: multicom_usa@saertex.com 
 

SAERTEX multiCom® (Pinghu), China


A rolling stone gathers no moss. (Chinese proverb)

For a number of years SAERTEX multiCom® coordinated all activities for the Asia-Pacific region from their location in Taicang near Shanghai. In the beginning of 2017 the location relocated to Pinghu and a own production was built. The experience of recent years shows that the use of GRP-liners for the non-disruptive sewer renovation in Asia has rapidly increased.

However, countries of Western Asia and Australia have high potential - and so the activities in this area are successfully bundled near Shanghai.

Locally, our customers have the support of experienced application engineers and a UV system is available.

SAERTEX multiCom® (Pinghu) Co., Ltd.
Building #4
No. 1033 Xinxing San Road
314200, Pinghu, Zhejiang / China
 
Phone: +86 573 85799627
Fax: +86 573 85799610
E-Mail: multicom@saertex.com
 

Saerbeck, 05th April 2018

SAERTEX multiComeback: 1ST SAERTEX-LINER multiComebackLEFT THE PLANT

At the beginning of the week, with positive spirits, we bid farewell to the 1st impregnated SAERTEX-LINER multiComeback after the major fire at the end of January 2018: The SAERTEX-LINER Type M in DN 400/4 over 64 m, will be delivered to our long-standing partner Huneke Kanalsanierung GmbH in Norden, and installed almost in our neighbourhood in Neuenkirchen (48485) on Emsdettener Straße next week. We are staying on the ball!

Read more...

Saerbeck, 15th February 2018

SAERTEX multiComeback: A BIG STEP FORWARD

There is a lot going on in the grounds of SAERTEX multiCom in Saerbeck: The clean-up of the warehouse and production hall, which burnt down during the major fire on January 25, 2018, is in full swing. At the same time, in the area of dry production, everything was disposed of, tidied up, cleaned and the damage caused by the flooding has been repaired.

Read more...


Saerbeck, 05th February 2018

SAERTEX multiComeback: ONE WEEK AFTER THE MAJOR FIRE

One week after the major fire at SAERTEX multiCom GmbH in Saerbeck, all employees met for an informational meeting in the dry production hall on February, 01st 2018. This area was almost spared by the fire. During the one-hour event, the shareholders and managing directors made a clear commitment to SAERTEX multiCom.

Read more...


Saerbeck, 31st January 2018

ALL THE SIGNALS ARE SET TO GREEN!

We are all still trying to come to terms with the events of last Thursday. Above all, we are pleased that the evacuation ran in exemplary fashion and that no-one was injured.

Read more...


Saerbeck, 26th January 2018

THE DAY AFTER – SAERTEX® AND SAERTEX multiCom® RESUME OPERATIONS

Almost 24 hours to the minute after the fire alarm was triggered, operations at SAERTEX GmbH & Co. KG have resumed at 100 per cent. Employees in the administration and production have been back on the job since 06:00 a.m. The same applies to the administration of SAERTEX multiCom GmbH. Clean-up operations have commenced at the SAERTEX multiCom production plant. Management is relieved that no one was injured, and would like to thank the more than 300 responders of the fire department, the THW (Technical Relief Service) and the German Red Cross – as well as all SAERTEX employees.

Read more...


Saerbeck, 25th January 2018

UPDATE:

OFFICIAL ALL-CLEAR: THE FIRE AT SAERTEX multiCom IS UNDER CONTROLL

The fire on the factory premises of SAERTEX multiCom has been brought under control by the fire department. The warning to the local residents has been lifted. Thankfully no was harmed and only material damage result from the fire.

Read more...


Saerbeck, 25th January 2018

MAJOR FIRE AT SAERTEX multiCom IN SAERBECK

Since the early morning, the production hall on the factory premise of SAERTEX multiCom in Saerbeck has been burning. Currently the fire is being fought by the fire department. The factory premise has been evacuated and according to the most recent status no one has been harmed. We will give updates on the status here as well as through our communication channels.

Read more...

Saerbeck, 05th January 2018

SF SHAFT-LINER SHOWCASE IN EMSBÜREN, GEMRANY: SUCCESSFUL INSTALLATION AND A POSITIVE ATMOSPHERE DESPITE CYCLONE XAVIER 

In early October, more than 20 visitors from local authorities, engineering firms, and associations from northern Emsland right through to the south of the Ruhr district braved the autumnal weather, with its storms and torrential rain: They accepted an invitation from SAERTEX multiCom GmbH and took the opportunity to find out more about the installation of shaft liners at first hand at the first “SF shaft-liner showcase”-

Read more...


Saerbeck, 22 December 2017

SOMETHING TO ROUND OUT THE END OF THE YEAR!

Shortly before the end of the year, the 60,000th (produced at the Saerbeck plant)  SAERTEX-LINER ran from the production line. Reason enough for the SAERTEX multiCom team in Saerbeck to meet before the holidays for a group photo on the training facility in order to document this success.

Read more...



Saerbeck, 04 December 2017

WATER FOR ALL – ALL FOR WATER: GIVING THE GIFT OF WATER

Viva con Agua de Sankt Pauli e.V. is a charitable association that is committed to ensuring that everyone around the world has access to clean DRINKING WATER. To achieve this goal, we are once again sponsoring a water project in the Chitwan region of Nepal this year and donating EUR 5,000 instead of...

Read more...


Saerbeck, November 2017

7th Saerbeck Pipe Symposium: A complete success!

 The end of September, we opened the doors to our 7th Saerbeck Pipe Symposium in this, the twentieth year of our company’s history under the best weather conditions, and we are now finishing off the follow-up work. There is only one thing to say: The event under the title: “Trenchless pipe rehabilitation: sustainable – economical – innovative!” as a complete success! And many thanks to our team who prepared and supported this unforgettable event!

Read more...

Saerbeck, 19th October 2017

New production and warehouse facility for SAERTEX multiCom

The construction work began early October on a new warehouse and production facility for SAERTEX multiCom at the site in Saerbeck. The project involves the installation of additional new production systems to expand the capacity for GRP-liners at the facility, which covers a surface area of  4,500 m2. The field of house connection liners (HASE) is being expanded with new areas, especially for the packaging, the impregnation, and the storage of the new light-cured liner.

Read more...


Saerbeck, 25th September 2017

May we introduce...
Stephan Raab who is taking over responsibility for sales management in Europe and Africa at SAERTEX multiCom

On September 1 2017, Mr. Stephan Raab took on the position of Sales Manager for Europe and Africa at the international GRP liner manufacturer SAERTEX multiCom.

Read more...


Saerbeck / Stavanger, 14 Juni 2017

Unique worldwide: Tab connection succeful installed to a rehabilitated potable water pipe!

Today, together with the company Hawle Water Technology Norge, we have achieved THE breakthrough and installed a tab connection to a potable water pipe, which has been trenchless rehabilitated using the SAERTEX-LINER H2O.

Read more...


Saerbeck, May 2017

Organizational Change: Dipl.-Ing. Roland Hahn

Dear Friends and Partners

Our colleague Roland Hahn has decided to accept a new challenge as a partner in a consulting office in our industry. His new working environment will be closer to his home city and requests less travel. Therefore Roland Hahn is leaving SAERTEX multiCom at his own request as of June 30, 2017. 

Read more...


Wloclawek, April 2017

A customized one-of-a-kind solution: Trenchless egg-shaped section helps rehabilitate a main sewer

The unique project to rehabilitate the sewage system in the agglomeration of Włocławek began in January 2016 when a contract was signed between the supplier F.H.I. “Instbud Stanislaw Boguta” and the Polish city of Włocławek following an open tender. The aim of the project was to develop a complex rehabilitation concept and carry out the planned rehabilitation work in expert fashion.

Read more...


Saerbeck / Berlin, March 2017

Technology and research in practice: rehabilitating a DN 225 potable water pipeline with SAERTEX-LINER® H2O on Schöneberger Ufer for WASSER BERLIN INTERNATIONAL trade fair.

Subtitled “Technology and research in practice,” the exhibition “Experience Water” will be held on March 30, 2017, as part of the WASSER BERLIN INTERNATIONAL trade fair. Visitors from around the world will get an insight into innovative pipeline construction methods. 

Read more...


Saerbeck, February 2017

Trenchless rehabilitation of a mouth-shaped sewer: a special project for the 50,000th SAERTEX-LINER®

In the past year, we not only celebrated the 20th anniversary of SAERTEX multiCom®, but also the production of the 50,000th SAERTEX-LINER® for the trenchless rehabilitation of pipes at our location in Saerbeck in the region of Münster, Germany.

Read more...