Filter
-
New Managing Director in China introduced
Read moreAt the beginning of February 2025, SAERTEX multiCom introduced Michael Ellenrieder as the new Managing Director in China. With immediate effect, he has taken over the management of the new production site in Pinghu, where the company produces its SAERTEX LINERS for the Middle East and Asia-Pacific.
-
EcoVadis Platinum Rating and EPDs for the Entire Product Range
Read moreSustainability is an integral part of the corporate culture at SAERTEX multiCom and embedded in its DNA. Trenchless pipe rehabilitation using SAERTEX-LINERS makes a valuable contribution to protecting the precious resource of drinking water. Beyond this, the company is committed to its sustainability strategy, contributing to a sustainable future and a responsible society. This strategy is built on three pillars: socially fair, ecologically responsible, and economically efficient actions. With the EcoVadis Platinum Rating and the publication of five EPDs, SAERTEX multiCom has once again demonstrated its commitment to sustainable solutions in trenchless pipe rehabilitation with GRP liners.
-
Rehabilitating success with SAERTEX-LINER
Read moreIn a challenging alley location, Cappagh Group successfully rehabilitated 180 meters of badly deformed pipes with the support of S1E Ltd, utilizing the SAERTEX-LINER and the Trelleborg Starlight UV system for efficient installation and curing.
-
An article in Wirtschaft Aktuell
Read moreAn article by SAERTEX multicom in the current issue of Wirtschaft Aktuell with Ivo Hemsing, Daniel Kollmann, Kai Diecks and Timo Münstermann.
-
The SAERTEX Group receives its first EcoVadis award
Read moreThe SAERTEX Group announces that the company has been awarded the Bronze Medal by EcoVadis. This award recognizes the company's outstanding efforts in the area of sustainability. The entire SAERTEX Group has received a good rating, placing it in the top 35% of companies within the EcoVadis rating system.
-
Trenchless by Night
Read moreSuccessfully rehabilitating a potable water supply line with the SAERTEX-LINER® H2O using the UV-CIPP process secured the potable water supply for some 900,000 families in Santo Amaro in June 2023. The 520-meter-long DN 873 potable water supply line requiring rehabilitation is located in a heavily trafficked area in Santo Amaro, a district of southern São Paulo.